S-34.1, r. 1 - Regulation respecting petroleum exploration, production and storage in a body of water

Full text
115. The authorization holder must, within 12 months after the granting of the authorization by the Minister, start the drilling work.
O.C. 1251-2018, s. 115.
In force: 2018-09-20
115. The authorization holder must, within 12 months after the granting of the authorization by the Minister, start the drilling work.
O.C. 1251-2018, s. 115.